Skip to main content
HACCPLAN

PS-5

Codex HACCP (CXC 1-1969) · Section A Five Preliminary Steps

PS-5 On-site verification of the flow diagram

The HACCP team should walk the line during all stages and hours of operation to confirm the flow diagram is accurate. Modify the diagram where it does not match actual practice. The verified diagram is the foundation document for the hazard analysis.

Back to Codex HACCP (CXC 1-1969) contents